Company records / greenlancer.com
GreenLancer GreenLancer (greenlancer.com ): 5 changes recorded in its website history since September 2010. Homepage last checked 6 November 2026.
First recorded website Recorded changes Messaging history Cite this record Report a correction
Recorded changes Newest observations first. Each interval bounds when the website changed; it is not an exact event date.
Headline Between 14 January 2025 and 9 July 2026
Before Permit Design & Engineering Reviews for Solar & EVC Contractors
After Solar Engineering & Repairs Made to Order
Observed on the company’s website; business claims are not independently verified.
Added a free sign-up or free trial.
Observed on the company’s website; business claims are not independently verified.
Headline Between 25 January 2022 and 2 July 2023
Before Solar Permits | Design | Engineering Commercial & Residential
After Permit Drafting & Engineering Reviews for High Volume Solar Installers
Observed on the company’s website; business claims are not independently verified.
Headline Between 23 July 2020 and 25 January 2022
Before We make Outsourcing
After Solar Permits | Design | Engineering Commercial & Residential
Observed on the company’s website; business claims are not independently verified.
Hiring Between 9 October 2014 and 12 January 2016 Added a careers page.
Observed on the company’s website; business claims are not independently verified.
First recorded website Observed 9 October 2014
Our earliest capture with readable facts. This is our first observation, not when the company introduced these things. These website claims are not independently verified.
How it described itself GreenLancer | Renewable Energy Made Easy with GreenLancer.com
archived page Link to first observation
All facts above belong to this capture. Unlisted fields mean we have no readable observation, not that they were absent.
How it describes itself Similar headlines are grouped together. The quote shown is from the last capture in each group, not necessarily the exact wording throughout that period.
July 2026 – November 2026 · 2 captures · latest observed messaging Solar Engineering & Repairs Made to Order GreenLancer offers fast, affordable solar permit design, engineering, and repair services with unmatched quality and turnaround time.
This wording observed 6 November 2026.
Inspect 2 captures in this group 9 July 2026 · Solar Engineering & Repairs Made to Order archived page 6 November 2026 · Solar Engineering & Repairs Made to Order current website Historical capture not publicly available July 2023 – January 2025 · 2 captures Permit Design & Engineering Reviews for Solar & EVC Contractors GreenLancer is the US leader in EV charging station and solar permit design and engineering, with the industry's best pricing and turnaround time.
This wording observed 14 January 2025.
Inspect 2 captures in this group 2 July 2023 · Permit Drafting & Engineering Reviews for High Volume Solar Installers archived page 14 January 2025 · Permit Design & Engineering Reviews for Solar & EVC Contractors archived page Seen January 2022 · 1 capture Solar Permits | Design | Engineering Commercial & Residential GreenLancer is the United State's leader in solar permit design & solar engineering with the industry's best pricing & turnaround time.
This wording observed 25 January 2022.
Seen July 2020 · 1 capture We make Outsourcing GreenLancer makes outsourcing easy for solar installers. Sign up for a FREE account and instantly shop solutions for your solar projects.
This wording observed 23 July 2020.
Seen October 2014 · 1 capture GreenLancer | Renewable Energy Made Easy with GreenLancer.com This wording observed 9 October 2014.
Cite this record StartupHistory, “GreenLancer” company record, https://startuphistory.org/c/greenlancer.com
Machine-readable: /c/greenlancer.com.json . How changes are found: method .